Work capacity: How much work someone can do.
Effort: How hard someone tries to do work.
Productivity: How much work gets done in a time period.
Capability: What someone is able to do.
- Work capacity measures how much work someone can do
- We measure effort by how hard someone tries
- Productivity is measured by amount of work completed
- Capability is what someone can do
Work capacity is how much work someone can do
Effort measures how hard someone works
Productivity measures how much gets done
Work capacity measures effort and productivity
Work capacity measures how much work someone can do and how hard they try.
• Capacity measurement: Measures how much work can be done
• Effort assessment: Measures how hard someone works
• Productivity evaluation: Measures work completed
Productivity comparison: Comparing how much work gets done in same time
Rate calculation: Work completed per time unit
Tom: 5 problems, Sarah: 3 problems
Since 5 > 3, Tom did more work
Tom has higher work capacity
Tom has higher work capacity because he completed more problems in the same time.
• Time comparison: Compare work done in same time period
• Higher = More: More work completed means higher capacity
• Same conditions: Must compare under same circumstances
Productivity rate: Work completed per time unit
Per minute calculation: Problems divided by minutes
John: 4 problems ÷ 8 minutes = 0.5 problems per minute
Mary: 6 problems ÷ 12 minutes = 0.5 problems per minute
Both have 0.5 problems per minute
Both have the same productivity
Both John and Mary have the same productivity rate.
• Rate calculation: Divide work by time
• Equal rates: Same productivity if rates are equal
• Time adjustment: Calculate per unit time for fair comparison
Productivity: How much work gets done
Effort: How hard someone works
Capacity: Ability to do work
Rate: Work per unit time
- Count the work completed
- Measure the time taken
- Calculate the rate (work ÷ time)
- Compare with others
• Productivity = Work ÷ Time
• Higher rate means higher capacity
• Same time comparisons are fair
• Effort affects productivity
Reading productivity: Pages read per minute
Rate comparison: Compare efficiency of reading
Emma: 12 pages ÷ 30 minutes = 0.4 pages per minute
David: 8 pages ÷ 20 minutes = 0.4 pages per minute
Both have 0.4 pages per minute
Both Emma and David have the same reading productivity.
• Rate calculation: Divide pages by minutes
• Equal rates: Same productivity if rates are equal
• Fair comparison: Calculate per unit time
Multi-step problem: Requires calculating rates and comparing
Productivity rate: Puzzles completed per minute
Alex: 15 puzzles ÷ 45 minutes = 0.33 puzzles per minute
Ben: 10 puzzles ÷ 30 minutes = 0.33 puzzles per minute
Both have approximately 0.33 puzzles per minute
Both have the same productivity
Both Alex and Ben have the same puzzle-solving productivity.
• Step-by-step: Calculate each rate separately
• Rate calculation: Divide work by time
• Comparison: Compare calculated rates
Work capacity: How much work someone can do.
Productivity: Efficiency of work completion.
Effort: Intensity of work.
Rate: Work per unit time.
- Count work: Count completed tasks
- Measure time: Record time taken
- Calculate rate: Divide work by time
- Compare rates: Compare calculated rates
• Rate = Work ÷ Time
• Higher rate = Higher productivity
• Same time = Direct comparison
• Different time = Calculate rate
Reading: 0.4 pages per minute
Math: 0.5 problems per minute
Puzzles: 0.33 puzzles per minute
Writing: 0.2 sentences per minute
Drawing: 0.1 pictures per minute
Analysis: The chart shows different productivity rates.
- Highest: Math problems (0.5 per minute)
- Lowest: Drawing (0.1 per minute)
- Range: From 0.1 to 0.5 per minute