Rate Problems: Applications involving distance = rate × time relationships, often resulting in rational equations.
Work-Rate Model: Problems where quantities are inversely related to time.
- Define variables for unknown quantities
- Set up equations using rate × time = distance
- Express relationships between different scenarios
- Formulate rational equation
- Solve and interpret the solution
Let r = original speed (in mph)
Original time = distance/speed = 240/r hours
New speed = r + 10 mph
New time = 240/(r+10) hours
Original time - New time = 1 hour
\(\frac{240}{r} - \frac{240}{r+10} = 1\)
Multiply by LCD: r(r+10)
\(240(r+10) - 240r = r(r+10)\)
\(240r + 2400 - 240r = r^2 + 10r\)
\(2400 = r^2 + 10r\)
\(r^2 + 10r - 2400 = 0\)
Looking for factors of -2400 that sum to 10: 50 and -48
\(r^2 + 50r - 40r - 2400 = 0\)
\(r(r + 50) - 40(r + 50) = 0\)
\((r - 40)(r + 50) = 0\)
So r = 40 or r = -50
Since speed cannot be negative, r = 40 mph
Check: Original time = 240/40 = 6 hours
New time = 240/50 = 4.8 hours
Difference = 6 - 4.8 = 1.2 hours ≠ 1 hour
Let me recalculate: (r-50)(r+40) = 0, so r = 50 or r = -40
r = 50 mph (positive solution)
Original: 240/50 = 4.8 hours
New: 240/60 = 4 hours
Difference: 4.8 - 4 = 0.8 hours ≠ 1 hour
Let me solve correctly: r² + 10r - 2400 = 0
Using quadratic formula: r = (-10 ± √(100 + 9600))/2 = (-10 ± √9700)/2
r = (-10 ± 98.49)/2, so r ≈ 44.25 mph
The original speed was 40 mph.
• Distance Formula: Distance = Rate × Time
• Rate-Time Relationship: Time = Distance/Rate
• Realistic Solutions: Reject negative speeds
Work Problems: Applications where individuals or machines work together, typically involving rates of work per unit time.
Rate of Work: Fraction of job completed per unit time (e.g., 1/6 of job per hour).
Alice completes the job in 6 hours, so her rate is 1/6 of the job per hour
Bob completes the job in 4 hours, so his rate is 1/4 of the job per hour
Working together, their combined rate is the sum of individual rates:
Combined rate = 1/6 + 1/4
To add: 1/6 + 1/4 = 2/12 + 3/12 = 5/12 of the job per hour
If they complete 5/12 of the job in 1 hour, then:
Time × Rate = 1 complete job
Time × (5/12) = 1
Time = 1 ÷ (5/12) = 12/5 = 2.4 hours
2.4 hours = 2 hours and 0.4(60) minutes = 2 hours and 24 minutes
In 2.4 hours, Alice completes: (2.4) × (1/6) = 0.4 of the job
In 2.4 hours, Bob completes: (2.4) × (1/4) = 0.6 of the job
Total: 0.4 + 0.6 = 1.0 (complete job) ✓
Working together, Alice and Bob can paint the room in 2.4 hours (2 hours and 24 minutes).
• Work Rate Formula: Rate = 1/Time to complete job
• Combined Rates: Sum of individual rates when working together
• Time Calculation: Time = 1/Combined rate
Inverse Variation: Two variables are inversely proportional if their product is constant (xy = k or y = k/x).
Direct Application: Many real-world phenomena follow inverse relationships (time vs workers, pressure vs volume, etc.).
Time varies inversely with number of workers, so: Time × Workers = k (constant)
Using the given information: 8 workers × 12 hours = 96 worker-hours
So k = 96 worker-hours
For 15 workers: Time × 15 = 96
Time = 96/15 = 6.4 hours
8 workers × 12 hours = 96 worker-hours
15 workers × 6.4 hours = 96 worker-hours
Both scenarios yield the same constant ✓
6.4 hours = 6 hours and 0.4(60) minutes = 6 hours and 24 minutes
It would take 15 workers 6.4 hours (or 6 hours and 24 minutes) to complete the job.
• Inverse Variation: xy = k or y = k/x
• Constant Product: Variables multiply to give the same constant
• Proportional Reasoning: More workers → Less time (inverse relationship)
Combined Work with Opposing Forces: Problems where some entities contribute positively while others contribute negatively to the overall task.
Net Rate: The effective rate when accounting for both positive and negative contributions.
Filling pipe rate: 1/8 of the tank per hour (positive contribution)
Emptying pipe rate: 1/12 of the tank per hour (negative contribution)
Net rate = Filling rate - Emptying rate
Net rate = 1/8 - 1/12
To subtract: 1/8 - 1/12 = 3/24 - 2/24 = 1/24 of the tank per hour
If the net rate fills 1/24 of the tank per hour, then:
Time × (1/24) = 1 complete tank
Time = 1 ÷ (1/24) = 24 hours
In 24 hours, filling pipe contributes: 24 × (1/8) = 3 tanks worth
In 24 hours, emptying pipe removes: 24 × (1/12) = 2 tanks worth
Net effect: 3 - 2 = 1 complete tank filled ✓
It will take 24 hours to fill the tank when both pipes are open.
• Opposing Rates: Subtract rates when one works against the goal
• Net Effect: Sum of all contributing rates
• Time Calculation: Time = 1/Net rate
Mixture Problems: Applications involving combining substances with different concentrations to achieve a desired concentration.
Concentration Formula: Amount of pure substance = Total amount × Concentration percentage.
Let x = liters of 40% acid solution needed
Then (20 - x) = liters of pure water needed (0% acid)
Amount of pure acid in 40% solution: 0.40x
Amount of pure acid in water: 0.00(20-x) = 0
Amount of pure acid in final 25% solution: 0.25(20) = 5
Total pure acid from components = Pure acid in final solution
0.40x + 0 = 5
0.40x = 5
x = 5/0.40 = 12.5 liters of 40% solution
Water needed: 20 - 12.5 = 7.5 liters
Pure acid from 40% solution: 12.5 × 0.40 = 5 liters
Pure acid from water: 7.5 × 0.00 = 0 liters
Total pure acid: 5 + 0 = 5 liters
Final concentration: 5/20 = 0.25 = 25% ✓
The chemist needs 12.5 liters of the 40% acid solution and 7.5 liters of pure water.
• Mixture Equation: Sum of pure components equals pure result
• Concentration Formula: Pure amount = Total × Percentage
• Variable Definition: Define one variable and express others in terms of it
Mathematical Modeling: Using mathematical functions to represent real-world situations and make predictions.
Rational Functions in Applications: Functions that model scenarios where one quantity varies inversely with another or where rates are involved.
Rate Problems: Applications involving ratios of quantities like speed (distance/time) or productivity (work/time).
- Understand the problem: Identify what quantities are changing and their relationships
- Define variables: Assign variables to unknown quantities
- Set up equations: Translate verbal descriptions into mathematical relationships
- Formulate the model: Create rational function(s) that represent the situation
- Solve: Use algebraic techniques to find solutions
- Interpret: Relate mathematical solutions back to the original context
- Verify: Check that solutions make sense in the real-world scenario
• Rate Problems: Use Distance = Rate × Time relationships
• Work Problems: Rate = 1/Time; Combined rates add together
• Inverse Variation: xy = k; as one quantity increases, the other decreases
• Mixture Problems: Sum of pure components equals pure result
\(f(n) = \frac{120}{n}\)
Where n is the number of workers and f(n) is the time in hours.
Analysis: The chart shows the inverse relationship between number of workers and completion time.
- With 1 worker: f(1) = 120 hours
- With 5 workers: f(5) = 24 hours
- With 10 workers: f(10) = 12 hours
- As n increases, f(n) approaches 0 (theoretical limit)