Projectile Motion: The height of an object thrown upward follows a quadratic function: h(t) = -16t² + v₀t + h₀ (in feet) or h(t) = -4.9t² + v₀t + h₀ (in meters).
- Identify the quadratic function parameters
- Find when h(t) = 0 to determine when the object hits the ground
- Find the vertex to determine maximum height and time
- Solve using quadratic formula or factoring
- Interpret results in context of the problem
h(t) = -16t² + 48t + 64
Initial velocity: v₀ = 48 ft/s, Initial height: h₀ = 64 ft
-16t² + 48t + 64 = 0
Divide by -16: t² - 3t - 4 = 0
Factor: (t - 4)(t + 1) = 0
So: t = 4 or t = -1 (negative time not meaningful)
Time at vertex: t = -b/(2a) = -48/(2×(-16)) = -48/(-32) = 1.5 seconds
h(1.5) = -16(1.5)² + 48(1.5) + 64
h(1.5) = -16(2.25) + 72 + 64 = -36 + 72 + 64 = 100 feet
The ball hits the ground after 4 seconds and reaches maximum height of 100 feet after 1.5 seconds.
The ball hits the ground after 4 seconds and reaches its maximum height of 100 feet after 1.5 seconds.
• Projectile Motion: h(t) = -16t² + v₀t + h₀ (in feet)
• Maximum Height: Occurs at vertex t = -b/(2a)
• Ground Impact: Solve h(t) = 0
Profit Function: A quadratic function that models the relationship between the number of units sold and profit. The vertex represents the optimal production level for maximum profit.
P(x) = -2x² + 80x - 300
a = -2, b = 80, c = -300
For maximum profit: x = -b/(2a) = -80/(2×(-2)) = -80/(-4) = 20
P(20) = -2(20)² + 80(20) - 300
P(20) = -2(400) + 1600 - 300 = -800 + 1600 - 300 = 500
x = 20 hundreds = 2,000 units
P = 500 thousands = $500,000
Since a = -2 < 0, the parabola opens downward, confirming maximum at vertex
The company should sell 2,000 units to maximize profit, achieving a maximum profit of $500,000.
• Profit Maximization: Vertex of downward-opening parabola gives maximum
• Vertex Formula: x = -b/(2a) for optimal production level
• Context Interpretation: x is in hundreds, P is in thousands
Area Optimization: Problems where we want to maximize or minimize an area given constraints. These often result in quadratic functions that can be optimized using vertex formulas.
Let w = width (perpendicular to river), l = length (parallel to river)
Only three sides need fencing: 2w + l = 200
From constraint: l = 200 - 2w
Area: A = w × l = w(200 - 2w) = 200w - 2w²
A(w) = -2w² + 200w
Maximum occurs at w = -200/(2×(-2)) = -200/(-4) = 50 meters
l = 200 - 2(50) = 200 - 100 = 100 meters
Max Area = 50 × 100 = 5,000 square meters
The field should be 50 meters wide and 100 meters long to maximize the area at 5,000 square meters.
• Optimization: Express area as a function of one variable
• Constraint: Use given constraint to eliminate one variable
• Vertex Formula: x = -b/(2a) gives optimal value
Quadratic Word Problems: Real-world scenarios that require setting up and solving quadratic equations to find unknown quantities or optimal values.
Projectile Motion: The curved path of an object thrown or projected into the air, following a quadratic function.
Optimization: The process of finding the maximum or minimum value of a function, often used in business and engineering applications.
Area Problems: Problems involving maximizing or minimizing rectangular areas given perimeter constraints.
Profit/Revenue Problems: Business applications where quadratic functions model relationships between quantity and financial outcomes.
- Read carefully: Understand the problem and identify what's being asked
- Define variables: Assign variables to unknown quantities
- Find relationships: Identify constraints and relationships in the problem
- Formulate equation: Create a quadratic function that models the situation
- Solve: Use factoring, completing the square, or quadratic formula
- Interpret: Apply solution back to the original context
- Verify: Check that solution makes sense in the real-world scenario
• Projectile Motion: h(t) = -16t² + v₀t + h₀ (feet) or h(t) = -4.9t² + v₀t + h₀ (meters)
• Vertex Formula: x = -b/(2a)
• Optimization: If a > 0 → minimum, if a < 0 → maximum
• Area Optimization: Express area as A = length × width, use constraints to reduce to one variable
Rectangle Area Problems: Problems involving the relationship between length, width, and area of rectangles, often resulting in quadratic equations.
Let w = width of the pool, then length l = 2w (twice as long as wide)
Area = length × width
200 = (2w) × w = 2w²
2w² = 200
w² = 100
w = ±10
Since width must be positive: w = 10 meters
l = 2w = 2(10) = 20 meters
Area = 10 × 20 = 200 square meters ✓
Length is twice the width: 20 = 2(10) ✓
The pool is 10 meters wide and 20 meters long.
• Area Formula: A = length × width
• Relationship Translation: Convert verbal relationships to mathematical expressions
• Positive Solutions: Physical dimensions must be positive
Free Fall Motion: Motion under the influence of gravity alone, with initial velocity of 0. The acceleration due to gravity is approximately 32 ft/s².
h(t) = -16t² + 144
Initial height: 144 feet, Initial velocity: 0 ft/s (dropped, not thrown)
Set h(t) = 0: -16t² + 144 = 0
-16t² = -144
t² = 9
t = 3 seconds (taking positive value)
Velocity is the derivative of height: v(t) = h'(t) = -32t
At t = 3: v(3) = -32(3) = -96 ft/s
The negative sign indicates the stone is moving downward
Speed at impact: 96 ft/s
h(3) = -16(9) + 144 = -144 + 144 = 0 ✓
The stone hits the ground after 3 seconds, with a velocity of -96 ft/s (speed of 96 ft/s downward).
• Free Fall: h(t) = -16t² + v₀t + h₀ (initial velocity = 0)
• Velocity: Derivative of position function
• Ground Impact: Height = 0
Quadratic Word Problems: Real-world scenarios that require setting up and solving quadratic equations to find unknown quantities or optimize situations.
Optimization Problems: Problems seeking maximum or minimum values, where the vertex of the quadratic function provides the solution.
Projectile Motion: The curved path of an object thrown or projected, following a quadratic function h(t) = -16t² + v₀t + h₀.
Area Problems: Problems involving rectangular areas where one dimension depends on another, creating quadratic relationships.
Profit/Revenue Problems: Business applications modeling the relationship between quantity sold and financial outcomes.
- Problem identification: Read the problem carefully and identify what needs to be found
- Variable assignment: Assign variables to unknown quantities
- Relationship identification: Find all constraints and relationships in the problem
- Equation formulation: Convert relationships to mathematical equations
- Function creation: Create a quadratic function that models the situation
- Solution: Solve the quadratic equation using appropriate method
- <